Is everything broken/under construction at your house too?

Friday kitchen counters installed, bathroom vanity top same material/same time
Rented a lift to change out the light in the 2 story entry - $200 and 3.5 hours to get setup/take-down/return lift for 15 min/3 wire light
kitchen sink fixtures and disposal and then bath sink fixtures
Switch out 2 remote dimmers switches for pool lights after changing the bulbs last weekend
replace motor/rebuild pump for pool waterfall
minor cleaning on pool auto-fill valve
start on kitchen backsplash...
mortar cracks in waterfall since it pumped couple hundred gallons into the yard

Still need to do base boards downstairs (delayed since pressure valve had to be replaced on air compressor) and the ice machine micro switch on the fridge, and A/C and driveshaft on the daily driver, and, and...

Good think Wednesday is race car night... finish up a T56 rebuild for relaxation.